Laguna Bridge, Pinheiros River, Brasil
POST-TENSIONING SYSTEMS
Project:
Laguna Bridge, Pinheiros River, Brasil
Client:
Ulma Formas E Escoramentos Ltda.
Construction period:
January 2015 - March 2016
Construction company:
Odebrecht Infrastrutura / SPObras
Supplier:
SAS Protensão
Scope of supply:
SAS 900/1050 formwork ties FC 15, diameter 15 mm and SAS 950/105 post-tensioning thread bar, diameter 26.5, 32 and 36 mm.
Application:
Laguna Bridge consist of 1000 meters elevated road, including 105 meters over the Pinheiros river. The conforming project design had 2 temporary columns in the river. The redesign to construct the bridge with cantilever method saved 30% of the budget. The road beside the river was constructed over running traffic. The solution was to use scaffolding systems to construct the bridge over the 4 lanes of road. The SAS thread bar system was used to tie down and secure the weight of the scaffolding system and temporary steel structures.