Harbour installation, Eemshaven, Netherlands
GEOTECHNICAL SYSTEMS
Project:
Julianahaven in Eemshaven, Netherlands
Establishing of a permanent anchorage construction for the harbour installation
Client:
N. Kraaijeveld B.V.
Construction period:
October 2006 - January 2007
Construction company:
BAUER Funderingstechnieken BV, Mijdrecht, Netherlands
Scope of supply:
540 pcs. of thread bars SAS 670/800 Ø 75 mm with a total weight of 370 tons for the anchorage system, 1,080 pcs. of required accessories, like anchor nuts and lock nuts as well as coupling splices
Application:
Concerning to the aggressive environment conditions the long term durability will be ensured by a double corrosion protection assembly. Therefore the SAS thread bar is placed in a corrugated sheathing pre-grouted. So the SAS System can also be used for tensile loading in a durable application.